Evacuated 2011 - Day 99 - Sep 28, 2011

Tomorrow will be 100 days since we moved out of the house. A busy and productive day yesterday. Pat and I removed the hardwood floor from the kitchen. Musch of it, especially under the sink was warped and beyond saving. The hardwood floor in the den will be coming out this weekend and out to the dump it goes. We saved quite a bit from the pantry and kitchen so we have enough to use for patching when needed in the living room, dining room, entry way and hallway. The concrete floor is poured and dried in the basement. By tonight the sealer should be on so we can better see the color and texture. The driveway/patio is being poured today, at least 1/2 of it. The rest will be poured tomorrow and by early next week the staining will be done.
The Roxul insulation arrived yesterday as did the sub flooring I ordered for the kitchen and den. The only thing left to demolish will be the bedroom floor if we decide to, (which I think we will), and to remove more lathe and plaster.
Last Sunday we cleaned the inside of the porch.... (1st time through). We also scrubbed down the front of the house and started on the south side. We have come to realize that there is no magic cleaning solution to remove the dirt from the flood. It takes elbow grease and scrubbing.

No comments:

Post a Comment