Friday, December 9, 2011

Evacuated - Day 170 - Dec 9, 2011

As of today, the basement bathroom shower stall is 98% complete. I ordered the shower doors yesterday as Menards can not find the two that are supposed to be in stock. We are going to tile the floor of the bathroom with the same tile that is in the shower stall. All fixtures are here and ready to be installed.
Today the furniture for the den will arrive in the morning. At 1:00 I am meeting a local transport company to get our kitchen appliances from the storage unit and the washer, dryer, freezer and spare fridge from the farm and move them to the house.
The last of the flooring (carpet in back area) shoul be installed this weekend.